Overhaul for Turbine and Generator - Unit S1
Repair, maintenance, overhaul of turbines, generators and auxiliary equipment of Unit 1:
- Turbine repair and maintenance.
- Maintenance of 60MW generator.
- Repair and maintenance of steam turbine regulation valve system.
- Repair and maintenance of steam extraction valve system.
Other Projects
Repairing Boiler and auxiliary equipment - 2022
Scaffolding rental for Shutdown period 2022
On-line leak sealing for 110-PV-0034 valve
Online leak sealing of water supply line to boiler A
Repairing, maintaining 41MW Steam turbine