Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Fabrication, installing water supply pipes across Vam Co Dong river

Fabrication, installing water supply pipes across Vam Co Dong river

View more
Cleaning steam turbine heat exchanger

Cleaning steam turbine heat exchanger

View more
Manufacturing, installing D600 steel pipes

Manufacturing, installing D600 steel pipes

View more
Fabrication and installation of vanes, valve slots

Fabrication and installation of vanes, valve slots

View more
Drain Hot-reaheat online leak sealing

Drain Hot-reaheat online leak sealing

View more
Daily maintenance

Daily maintenance

View more